PUBLIC WORKS MONTHLY REPORT
DATE:  NOVEMBER 2005
FROM:  WALLY DELAMATER, VILLAGE MANAGER

SEWER:

Pumped through North Street Lift Station: 3,711,704 gals

Average pumped per day: 123,723 gals

Average pumping rate: 782.07 gpm

Max day pumped: 150,626 gals

Lift station run time: 79.1 hrs

Average run time per day: 2.64 hrs

Run time year to date: 890.91 hrs

Total pumped year to date: 41,949,293 gals

Discharged from Ponds to RIBS: 5,984,000 gals

Total discharged year to date: 39,086,000 gals

Total in storage to date:  10% of capacity 2,835,798 gals

WATER:

Pumped from well #3 3,381,000    gals

Average pumped per day: 113,000    gals

Maximum day pumped: 143,000    gals

Minimum day pumped: 83,000    gals

Total pumped year to date: 45,687,000    gals

Pump run time this month Wells #3 82.9    hrs

Average pump run time per day: 2.8    hrs

Gallons per minutes Well #3 629.17    gpm

Metered this month: 2,716,000    gals

Total metered this year: 34,695,000    gals

System loss this month: 20% 665,000    gals

System loss this year: 22% 10,360,000    gals

Chlorine used this month: 36.13    gals

Average used per day: 1.2    gals

Chlorine used this year: 472.4    gals

Information and comments:

  1. The higher water loss was due primarily to the water main project, flushing of 
    the water main and new services
  2. Leaf Vac. Is finished. It went very well.   There were no major 
    equipment failures. Limited complaints. With in Budget.
  3. All plow equipment has been put to use. The new salt spreader works well. 
    Still waiting for the new truck to be set up. Could be another month or two.
  4. Budget preperation moving along with full participation from Gary and Jason.
  1. Sludge removal was completed. A total of 742,500 pounds of sludge was removed 
    from 362,000 gallons A21of waste water mix.
  2. Discharge has been completed this year.
  3. As of December 8th all residents planned for connection to the water system 
    have been connected.
  4. Our new shed at the water tower is complete.
  5. The lightning that destroyed our controls at the tower were replaced. Approximately 
    $1,850.  Insurance paid $850. We also added additional lightning arresters on the electrical 
    and phone line. We also added a grounding system to the electrical and control panel

in the new building.

More...

Contact Us

Village Review

Ordinances

Service Schedule

Public Works

Airport information

Cemetery Information

Meeting Minutes

Other Links

State of Michigan

70th State Representative

33rd State Senator

4th U.S. Representative